Contact

Start with the line that is costing you the most.

The most useful first conversation is about one line, one product family and one measurable problem. Tell us which, and we will tell you what shadow mode would need and what it would baseline.

A person reads itNo drip campaignDesign partners first

run_scn_01 · agent graph · scenario 10 nodes · 1 approval gate
01 · orchestrator intake.receive ✓ SUCCEEDED 02 · orchestrator twin.simulate ✓ SUCCEEDED 03 · intake_separate separate.standardize ✓ SUCCEEDED 04 · pasteurize_homog pasteurize.verify ✓ SUCCEEDED 05 · ferment_culture culture.vat ✓ SUCCEEDED 06 · evaporate_dry dry.spray ✓ SUCCEEDED 07 · defect_inspect inspect.pack ✓ SUCCEEDED 08 · hygiene_cip cip.schedule ✓ SUCCEEDED 09 · orchestrator approve.human ◆ APPROVAL 10 · quality_conf release.genealogy ✓ SUCCEEDED

Illustrative scenario: Plant run · skim-milk-powder line + set-yogurt line · shared intake. Not a measured run.

Contact

Tell us about your line

The form opens your mail client with the message addressed to hello@milkeon.com. Nothing is stored on this site.

Or write directly to hello@milkeon.com.

Routes

Design partners
hello@milkeon.com
Partnerships
hello@milkeon.com
Careers
hello@milkeon.com
Security pack
hello@milkeon.com

One mailbox while the team is small. Named addresses follow as people join publicly.

What to include

  • The line and the products it runs
  • The systems on it: PLC and SCADA, analyzers, lab, MES, cameras
  • The number you would baseline
  • Who would approve a pilot
Reasons

Why people get in touch

Processors

A design-partner pilot

One line, one number, shadow mode first.

Vendors

A partnership

OEMs, MES, analyzer and vision suppliers who sell into dairy plants.

Quality and IT/OT

The security pack

Design posture, data flows and roadmap dates.

Engineers and technologists

A role

Perception, OT integration, simulation or dairy process.

Run timeline

What we would be deploying

Every Milkeon run is an ordered, inspectable sequence. This is run_scn_01, an illustrative scenario: Plant run · skim-milk-powder line + set-yogurt line · shared intake. Scenario complete · both streams inside spec · one human approval at the dryer.

run_scn_01 scenario · not measured SUCCEEDED
  1. 01 intake.receive SUCCEEDED 0.9 s

    Plant Orchestrator · Pulled both product specs, the HACCP plan with its pasteurization critical control point, the antibiotic screen for the tanker lot and the standing CIP window from MES and the lab system; locked the target envelope for the run.

  2. 02 twin.simulate SUCCEEDED 41 s

    Plant Orchestrator · Simulated 24 candidate recipes across separation, pasteurization, evaporation and spray-drying on the Lactwin as-processed twin; ranked them on composition margin, pasteurization margin, energy per kilogram of powder and takt, and discarded every candidate that thinned the pasteurization margin.

  3. 03 separate.standardize SUCCEEDED 3 m 05 s

    Intake-and-Separate · Fused inline NIR and mid-IR with the latest lab calibration, then trimmed the cream-skim split and the standardization blend valve so skim solids and the yogurt-stream fat sat at target with the minimum safe margin rather than the usual over-standardization.

  4. 04 pasteurize.verify SUCCEEDED continuous

    Pasteurize-and-Homogenize · Held HTST at or above 72 °C for 15 s through the holding tube with the flow-diversion valve armed; every critical control point reading was written to the audit log against the HACCP plan.

  5. 05 culture.vat SUCCEEDED 4 h 20 m

    Ferment-and-Culture · Predicted the acidification curve for the culture lot from inline pH and the upstream composition, held the vat temperature profile and timed the hold so pH landed on the set-yogurt target curve; no abnormal acidification was flagged.

  6. 06 dry.spray SUCCEEDED 2 h 10 m

    Evaporate-and-Dry · Ran the dryer against the twin's moisture and stickiness prediction; stepped inlet temperature and feed solids toward the minimum-energy setpoint while predicted outlet moisture stayed inside spec and fouling risk stayed low.

  7. 07 inspect.pack SUCCEEDED continuous

    Defect-and-Inspect · 16 camera streams across the two packing lines at the plant edge: fill, seal, cap and label checks on every unit, foreign-body and contamination models on the powder stream; two rejects were attributed back to a seal-jaw temperature drift and the packing line was notified.

  8. 08 cip.schedule SUCCEEDED 6 s

    Hygiene-and-CIP · Placed the pasteurizer and dryer CIP into the cheapest energy window, sequenced wash phases against tank availability and set the release checks that must pass before the next product.

  9. 09 approve.human APPROVAL 1 m 48 s

    Plant Orchestrator · The twin's lowest-energy candidate wanted a dryer inlet temperature above the site's bounded envelope. Held for the shift dairy technologist, who approved the step with a tighter outlet-moisture alarm.

  10. 10 release.genealogy SUCCEEDED 1 m 12 s

    Quality-and-Conformance · Both batches released: composition, CCP records, culture lot and pH curve, drying setpoints, inspection rejects and every human decision written to the batch genealogy and checked against spec.

First phase

What an engagement looks like

Gates, not dates. Each stage starts when the previous one has proven its number against your own baseline.

  1. Design partners. Three to five processors instrument the wedge workflow in shadow mode. We measure the baseline on yield, loss and energy from your own lab and meters.
  2. Assist mode. The agent recommends separation, pasteurization or drying moves and predicts composition and contamination; your engineer approves. Accuracy and ROI are proven against the baseline.
  3. Graduated autonomy. Low-risk separation, drying and inspection loops move to bounded automatic control with adaptive setpoints. Exceptions escalate to a person.
  4. Expansion. Adjacent modules are added within the same plant, then across sites.
Pricing

Priced per line, per plant, per group

Land on one workflow with a measured baseline. Expand by line, module, site and autonomy stage. Outcome components available on yield, loss, energy and water.

Line $14,000 per processing or drying line / month

Separation, pasteurization or drying control, or inspection AI, for one line. For processors validating ROI on the wedge.

  • One line, one agent module
  • Plant-edge inference node
  • Connectors to the line's PLC/SCADA, analyzers and MES
  • Review console, alerting, audit log and genealogy
  • Shadow and assist stages, then bounded autonomy after the agreed gates
Start a pilot
Enterprise Custom land $650k – $8.5M ACV

Dairy groups standardizing on Milkeon across sites, with custom product, composition and tolerance models.

  • Multi-site plant-edge fleet
  • Custom product, composition and tolerance models
  • SLAs and dedicated support
  • Outcome-based components on yield, loss, energy and water
  • On-prem or private-cloud deployment
Contact us

Annual prepay

A 15 to 20% discount for annual prepayment.

Multi-year

Enterprise agreements with usage ramps.

Outcome components

A share of measured yield, loss, energy or water improvement on the highest-value workflows.

Usage

Per-batch, per-line or per-action metering above plan limits.

Enterprise

Standardize autonomy across the group

One policy model, one audit trail and one set of yield, loss, energy and water benchmarks across every plant in the group, with each site's recipes and tolerance models kept private to that site.

Talk to us Enterprise details

  • Multi-site plant-edge fleet with shared model governance
  • Custom product, composition and tolerance models per site
  • SSO and role-based access, named approvers (roadmap, 6 to 12 months)
  • Model versioning, validation reports and rollback
  • On-prem or private-cloud deployment
  • SLAs and outcome-based components on the highest-value workflows
Guardrails

An agent that can move a setpoint needs a leash

Milkeon writes to production equipment in a food plant. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, inside per-tag rate and magnitude limits, at the autonomy stage the plant has set.
  • Critical control points are read, never written. Pasteurization time-temperature, flow diversion and release decisions stay with the HACCP plan and the people who own it.
  • Policy engine before every write. Autonomy stage, interlock state, product, shift and operator presence are evaluated before a setpoint moves.
  • Grounded and cited. Every recommendation carries a citation to the recipe, spec or procedure it relied on. Retrieval is tenant-isolated and permission-aware.
  • Immutable audit log. Append-only, exportable and retained on the plant's own storage, aligned to HACCP, FSMA, ISO 22000 and FSSC record-keeping.
  • Hard fallback. If the edge node, the network or a model stops, the plant keeps running on its existing PLC and SCADA control and interlocks.
  • Tenant and IP isolation. Recipes, supplier data and tolerance models never cross a customer boundary. On-prem deployment available.

Assurance posture

Assurance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Roadmap, first 6 months
SOC 2 Type IICloud control plane QUEUED Roadmap, 6 to 12 months
HACCP · FSMA · ISO 22000 · FSSC · CodexGrounding and record-keeping RUNNING Design basis for retrieval and the audit log
Per-tenant isolationData, memory, models RUNNING Design rule
On-prem deploymentRecipe-sensitive producers RUNNING Design option

Milkeon supports your food-safety records. It is not a certification and it does not replace your HACCP plan.

Read the security overview

From the plant floor

Who this is built for

The three people in a dairy plant whose week changes when the process runs itself, and what each of them needs from Milkeon.

Economic buyer

Plant or Operations Director

Owns production rate, quality, loss and yield, energy and water, and food safety. Wants a plant that holds spec at higher rate with fewer interventions, and a number that justifies the spend.

Champion

Dairy Technologist or Process Engineer

Owns separation and standardization, pasteurization, culture and drying recipes, process windows and yield. Approves and corrects the agents in assist mode; those corrections train the models.

Approver

Quality and Food-Safety Manager

Owns HACCP, FSMA, ISO 22000 and FSSC conformance, composition and contamination conformance, and batch genealogy. Needs every action grounded, cited and written to an immutable record.

IT/OT and sustainability leads approve the deployment. There are no customer quotes on this site yet; design partners will speak for themselves when they choose to.

Integrations

It speaks plant, not cloud

Milkeon reads and writes through the systems already on the floor. No parallel historian, no new HMI, no rip-and-replace. Connectors are built against each design partner's stack first; long-tail integrations are out of scope for the first release.

Plant automation

PLC and SCADA of separators, pasteurizers, homogenizers, culture vats, evaporators, spray dryers and CIP skids

Setpoint reads, guarded writes, interlocks untouched

Inline analyzers

NIR and mid-IR composition, inline pH, moisture, temperature and humidity

Continuous composition and process state

Lab systems

LIMS results, calibrations, antibiotic and micro screens

Calibration and release evidence

Dairy MES

Orders, recipes, product specs, batch genealogy

Targets in, release records out

Vision

Multi-camera stations on filling, sealing, capping, labeling and powder lines

Frames, defect events, reject commands

Energy and water

Plant and asset-level meters

Hard constraints for the dryer and CIP schedule

Robotics

Isaac-driven packaging, palletizing and handling cells

Perception and motion for packs and pallets

Identity (planned)

SSO and role-based access; SOC 2 on the roadmap

Named approvers, scoped roles

See all integrations

FAQ

Straight answers

The questions plant directors, technologists and quality managers ask in the first meeting.

Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside explicit limits. Every design partner starts in shadow mode, where Milkeon predicts and writes nothing. Assist mode follows, where a technologist approves each recommendation. Bounded autonomy on separation, drying and inspection loops comes after the food-safety and ROI gates agreed up front.

Get started

Or just send the line

A sentence about the line and the number is enough to start.